Project #E3518          Bid Date: Canceled

Cathcart Vactor Waste Facility, Snohomish County, WA #PW-25-0395SB

$1,104,606

Documents:
Plans
Specs

Addendum #1:
Addendum #1

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Snohomish County Public Works
3000 Rockefeller Avenue
M/S 507 - 5 Admn. East, Robert J. Drewel Building
Everett, WA 98201-4067
425-388-3344
purchasing@snoco.org

Issued by:
www.bxwa.com

Notes:
Bid Opening Information:
https://teams.microsoft.com/dl/launcher/launcher.html?url=%2F_%23%2Fl%2Fmeetup-join%2F19%3Ameeting_M2ZmMjUyMGYtZTdiZC00ODA5LTllMTAtNjFkMTMyZGI2YjNm%40thread.v2%2F0%3Fcontext%3D%257b%2522Tid%2522%253a%25226bd456aa-bc07-4218-897c-4d0a6a503ee2%2522%252c%2522Oid%2522%253a%252248564626-32d7-479b-b123-be51617e7a05%2522%257d%26anon%3Dtrue&type=meetup-join&deeplinkId=8caa38a7-b49c-4686-aa86-033a73f66684&directDl=true&msLaunch=true&enableMobilePage=true&suppressPrompt=true

The phone number for bid openings is: 1-425-262-2000, 712 654 577#

Description:
Contractor shall construct a nominal 60 foot by 75 foot tensioned fabric structure for temporary storage of vactor waste adjacent to a similar existing structure at the Project Site.

The work includes the following:
a. Removal of existing asphalt paving.
b. Site grading and fill for the new facility floor slab.
c. Reinforced concrete floor slab.
d. Precast concrete block walls placed on the new floor slab.
e. Supply and erection of the tensioned fabric structure on the precast concrete block foundation walls.
f. Asphalt pavement and pavement patching.

Obtain and pay for all permits required for the work including off-site transportation permit(s) if applicable, and any other permits.

Temporary facilities including but not limited to temporary utilities, Contractor’s office trailer (if needed), supplies, temporary barricades, signage, traffic management, flagging and other means of protecting the public and operations staff from hazards of the Work including traffic control during delivery and offloading of the tensioned fabric structure materials, and items in accordance with requirements of Section 01 57 19, “Temporary Facilities and Controls.”