2025 SWM Culvert Replacements, Snohomish County, WA #RR48113, WC8113, UPI 21-0032; RR48681, WC8681, UPI 21-0002 / PW-24-0374SB - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 379 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Notice of Call for Bids
Page 6 Vicinity Map
Page 7 Summary of Quantities
Page 9 Introduction / Special Provisions / Project Proposal
Page 11 Contents
Page 17 Introduction / Special Provisions
Page 18 Introduction to the Special Provisions / Division 1 General Requirements
Page 52 Division 2 Earthwork
Page 63 Division 3 Aggregate Production & Acceptance
Page 64 Division 4 Bases
Page 65 Division 5 Surface Treatments & Pavements
Page 76 Division 6 Structures
Page 81 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 82 Division 8 Miscellaneous Construction
Page 92 Division 9 Materials
Page 105 Prevailing Wage Information
Page 106 Benefit Code Key
Page 124 Supplemental to Wage Rates
Page 135 Washington State Prevailing Wage Rates - Snohomish County
Page 181 Project Proposal
Page 211 Appendix A Summary of Geotechnical Conditions
Page 299 Appendix B Permits
Page 326 Appendix C Stormwater Pollution Prevention Plan
Page 327 Stormwater Pollution Prevention Plan (SWPPP) - 9116 Grandview Road
Page 353 Stormwater Pollution Prevention Plan (SWPPP) - 9225 Cedarvale Loop Road
Page 378 Appendix D Monument Preservation