Project #NB22          Bid Date: 4/9/2025 @ 11:00 am PDT

Meadowbrook Improvement, City of North Bend, WA

$10,200,000

Low Bid:
Bids Received: 4
Apparent Low BidNorthwest Construction, Inc.$ 10,297,755.89
2ndMarshbank Construction, Inc.$ 10,865,329.61
3rdFury Site Works, Inc.$ 12,668,528.10
4thJames W Fowler Co.$ 14,450,069.87

Plans
Specs
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Plans
Addendum #3
Addendum #3 Plans
Addendum #4
Bid Results

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of North Bend
920 SE Cedar Falls Way
North Bend, WA 98045

Contacts:
Tom Mohr, PE
tmohr@northbendwa.gov

Issued by:
www.bxwa.com

Description:
The project scope of work consists of the following four schedules of work:

Schedule A – Sanitary Sewer ULID No. 7: The work includes the construction of sewer pipe to support a future low-pressure grinder pump system, to include approximately 12,400 LF of HDPE sewer force main ranging in sizes of 2-inch to 8-inch, 40 valves ranging in sizes of 2-inch to 8-inch, 43 low-pressure sewer services, 40 locate stations, auger boring three 30-inch steel casings totaling 260 LF, 1,030 LF of 8-inch PVC gravity sewer main, 13 48-inch manholes, 21 sewer cleanouts, a duplex grinder pump station including emergency standby generator, and associated surface restoration. In addition, the schedule will provide for the installation of a 3-inch force main by directional drilling, and installation of force main across two existing bridges.

Schedule B – NW 14th Street Water Main: The work includes the construction of approximately 1,500 LF of 12-inch DI Water Main, auger boring 145 LF of 30-inch steel casing, four fire hydrant assemblies, three 12-Inch Gate Valves, 16 water services, and associated surface restoration.

Schedule C – NW 14th Street Roadway Improvements: The work includes the reconstruction of approximately 1,000 LF of roadway consisting of approximately 3,400 SY of cement treated base, and 610 tons of HMA.

Schedule D – NW 8th Street Water Main: The work includes the construction of approximately 2,700 LF of DI water main ranging in sizes of 8-inch to 20-inch, auger boring two 30-inch steel casings totaling 125 LF, four fire hydrant assemblies, 13 12-inch gate valves, five water services, and associated surface restoration. In addition, the schedule will provide installation of a water main across an existing bridge.