Project #NB26          Bid Date: 10/15/2025 @ 11:00 am PDT

SR202 Shared-Use Trail Extension, City of North Bend, WA

$6,395,000

Plans
Specs
Addendum #1
Addendum #2
Addendum #3

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of North Bend
920 SE Cedar Falls Way
North Bend, WA 98045

Contact: Tom Mohr
tmohr@northbendwa.gov

Issued by:
www.bxwa.com

Notes:
Engineer's estimate for each schedule:
Schedule A: $5,300,000
Schedule B: $400,000
Schedule C: $695,000

Description:
The project scope consists of the following three schedules of work:

Schedule A – Shared-Use Trail: This work includes the construction of a shared-use trail and pedestrian facilities on the north side of State Route 202 (Bendigo Boulevard North) extending from Boalch Avenue NE to the City’s Wastewater Treatment Facility (WWTF), approximately 2,360 feet. Included in this work is the construction of an elevated boardwalk, concrete abutments and pedestrian bridge over South Fork Snoqualmie River, structural earth embankments, asphalt paved trail, three separate gravel access roads, pedestrian level lighting, wetland and stream mitigation planting, and surface restoration.

Schedule B – WWTF Frontage Improvements: This work includes the construction of frontage improvements along State Route 202 (Bendigo Boulevard North) extending from the shared-use trail to Sydney Avenue, approximately 420 feet. Included in this work is the construction of concrete curbs, gutters and sidewalks, storm drainage improvements, pedestrian level street lighting and surface restoration.

Schedule C - Sanitary Sewer ULID No. 7: This work includes the construction of approximately 210 linear feet of 8-inch HDPE sewer force main, approximately 260 linear feet of 8-inch ductile iron sewer force main across the new pedestrian bridge, approximately 570 linear feet of 12-inch PVC gravity sewer main, manholes, modifications to an existing manhole, and connections to the existing system.