Project #BBW7          Bid Date: 5/14/2026 @ 10:00 am PDT

2026 Water Main and Fire Hydrant Replacement Project, Birch Bay Water and Sewer District, Blaine, WA #25-A, 25-B & 25-C

$942,000

Plans
Specs
Bid Form

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Birch Bay Water and Sewer District
7096 Point Whitehorn Road
Birch Bay, WA 98230-9675
360-371-7100
Fax: 360-371-2806

Issued by:
www.bxwa.com

Engineer:
David Evans & Associates, Inc.
14432 SE Eastgate Way, Suite 400
Bellevue, WA 98007
425-519-6500
Fax: 425-519-5361

Contact: Rodney Langer
Rodney.Langer@deainc.com

Description:
Schedules A, B, and C include installation of approximately 800 lineal feet of 6” ductile iron water main, approximately 1,075 lineal feet of 8” ductile iron water main and 100 lineal feet of 2” water main, water main appurtenances, three connections to existing water main, as well as road and private improvements restoration and related work. Existing water main to be abandoned shall be decommissioned, filled and capped as part of the project. Schedules A, B, and C, consist of planned improvements independent of each other at three different sites.

Schedule D includes replacement of twenty existing fire hydrants and connecting to an existing foot valve, graded fire hydrant accesses, and installation of water system appurtenances in the locations listed.