Little Pilchuck Tributary Fish Passage Project, Cedar Springs Culvert Replacement, Snohomish Conservation District, Lake Stevens, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 240 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 4 Instructions to Bidders
Page 21 Public Works Bid Proposal
Page 26 Mandatory Bidder Responsibility Checklist
Page 28 Mandatory Subcontractor Responsibility Checklist
Page 30 Supplemental Bidder Certifications
Page 32 Certification of Compliance with Wage Payment Statutes
Page 33 List of Completed Projects
Page 36 Public Works Contract
Page 46 Exhibit A Summary of Work
Page 49 Exhibit B Performance & Payment Bonds
Page 50 Performance Bond
Page 53 Payment Bond
Page 56 Exhibit C Approved Permits
Page 57 Exhibit D Engineering & Construction Specifications
Page 63 Exhibit E Owner-Supplied Contract Drawings (Under Separate Cover)
Page 64 Exhibit F Design Report
Page 65 Exhibit C Permits
Page 134 Construction Inspection Plan
Page 138 USDA-NRCS Construction Specifications
Page 185 Basis of Design Report