Autumn Chase - Pool HVAC and Dehumidification Replacement, Housing Authority of Snohomish County (HASCO),Bothell, WA - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 282 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Section 00002 Table of Contents
Page 4 General Information
Page 5 Invitation to Bid
Page 6 Section 00040 Mandatory Pre-Bid Meeting
Page 7 Section 00120 Instructions to Bidders
Page 13 Bid Forms / Documents
Page 14 Section 00150 Notice to Bidders Regarding Bid Forms / Documents
Page 15 Section 00200 Bid Form
Page 18 Section 00205 Certificate at to Corporate Principal
Page 19 Section 00210 Contractor Certification
Page 22 Section 00230 Statement of Bidders Qualifications
Page 23 Section 00240 Bidder's Experience Record & References
Page 24 Contract Documents
Page 25 Section 00405 Payment of Prevailing Wage Rates
Page 27 Section 00500 Standard Form of Agreement
Page 51 Scope & Specifications
Page 52 Section 01100 Scope of Work Summary
Page 54 Section 01200 General Conditions
Page 62 Section 02070 Selective Demolition
Page 65 Section 090000 General Building Materials
Page 71 Section 200200 Operation & Maintenance Manual for Mechanical
Page 74 Section 200500 Common Work Results for Mechanical
Page 101 Section 200503 Existing Systems Work for Mechanical
Page 107 Section 200519 Piping Specialties for Mechanical
Page 112 Section 200529 Hangers & Supports for Mechanical
Page 122 Section 200530 Sleeves & Seals for Mechanical
Page 131 Section 200593 Testing, Adjusting, Balancing for Mechanical
Page 140 Section 200700 Mechanical Insulation
Page 154 Section 200800 Commissioning of Mechanical Systems
Page 158 Section 221100 Facility Water Distribution
Page 166 Section 225100 Swimming Pool Plumbing Systems
Page 170 Section 230933 Electric & Electronic Control System for HVAC
Page 177 Section 230993 Sequence of Operation for HVAC Controls
Page 180 Section 232113 Hydronic Piping
Page 190 Section 232128 HVAC Condensate Piping
Page 194 Section 232129 Combustion Condensate Piping
Page 198 Section 232300 Refrigerant Piping
Page 202 Section 233100 HVAC Ducts & Casings
Page 211 Section 233300 Duct Accessories
Page 217 Section 233400 Fans
Page 221 Section 233700 Air Outlets & Inlets
Page 225 Section 235216 Condensing Boilers
Page 233 Section 237224 Packaged Air-To-Air Energy Recovery Units - Pool
Page 241 Section 260100 Electrical General Requirements
Page 252 Section 260400 Existing Electrical Systems
Page 257 Section 260401 Electrical Demolition
Page 259 Section 260500 Basic Materials & Methods
Page 271 Section 260526 Grounding & Bonding
Page 273 Section 262000 Electrical Distribution