Satsop River RM 0 to 2 Phase 2 Restoration, Grays Harbor Conservation District, Montesano, WA
$4,550,000
Low Bid:
Bids Received: 5 | ||
Apparent Low Bid | Brumfield Construction Inc. | $ 3,450,529.17 |
2nd | Sunset Grill Construction | $ 3,813,882.64 |
3rd | Active Construction Inc. | $ 3,865,865.00 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Grays Harbor Conservation District
150 Technology Way, Suite 201
Elma, WA, 98541
Contract: Anthony Waldrop
360-346-2978
awaldrop@graysharborcd.org
Issued by:
www.bxwa.com
Prebid: 4/1 @ 10:00 am on site, 275 Brady Loop Rd. E. Montesano, WA, 98563
Notes:
Bid Opening Information:
In Person: 150 Technology Way, Suite 201 Elma, WA, 98541
Video call link: https://meet.google.com/xdc-intz-pnb
Or dial: (US) +1 662-532-9031 PIN: 886 305 978#
More phone numbers: https://tel.meet/xdc-intz-pnb?pin=6470735333172
Description:
Major Bid Items Will Include:
Mobilization, L.S.; Erosion/Water Pollution Control Measures, L.S.; Temporary Work Area Isolation, L.S.; Erosion Control Blanket, SY, 8400; High Visibility Fence, LF, 1160; Temporary Access And Staging, L.S.; Driveway Rehabilitation, Sf, 21600; Temporary Bridge, Ea, 2; Bank Excavation Incl. Haul, Suitable Material, Cy, 22850; Bank Excavation Incl. Haul, Unsuitable Material, Cy, 5710; Channel Excavation Incl. Haul, Cy, 650; Riprap Removal Incl. Haul, Cy, 3000; Driven Timber Pile, 18-Inch, Ea, 267; Driven Timber Pile, 16-Inch, Ea, 14; Driven Timber Pile, 14-Inch, Ea, 344; Rock Collar, Type 3, Ea, 8; Rock Collar, Type 5, Ea, 375; Type 1 Apex ELJ, Ea, 9; Bank Enhancement ELJ, Ea, 15; Floodplain Roughness ELJ, Ea, 2; Salvage Log Rows And Log Jacks, Ea, 18; Seeding, Ac, 11; Minor Change, T&M.