Camas TO4 Ultraviolet Disinfection Replacement, City of Camas, WA #SWR25004 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 1983 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Section 000110 Table of Contents
Page 7 Division 00 Procurement & Contracting Requirements
Page 9 Section 000107 Seals & Signatures
Page 15 Call for Bids
Page 18 Instructions to Bidders
Page 32 Bid Form
Page 38 Bid Bond (Damages Form)
Page 40 Section 005213 Agreement
Page 48 Section 006113.13 Performance Bond
Page 52 Section 006113.16 Payment Bond
Page 56 Section 007213 Standard General Conditions
Page 132 Section 007301 Supplementary Conditions
Page 154 Section 007346 Wage Determination Schedule
Page 155 Benefit Code Key
Page 173 Washington State Prevailing Wage Rates - Clark County
Page 199 Section 009113 Addendum Form
Page 203 The United States Department of Transportation - Appendix A of the Standard Title VI / Non-Discrimination Assurances
Page 205 The United States Department of Transportation - Appendix E of the Standard Title VI / Non-Discrimination Assurances
Page 207 Affidavit of Compliance with Public Work Contractor Lawful Hiring Compliance (E-Verify)
Page 209 Declaration of Option for Investment of Retained Percentage
Page 211 Apprentice Utilization
Page 213 Mandatory Bidder Responsibility Criteria Information
Page 214 Verification of Subcontractor Responsibility Criteria
Page 215 Acknowledgement of Contractor Lawful Hiring Compliance Enrollment
Page 216 Non-Collusion Declaration
Page 217 Local Agency Subcontractor List
Page 219 Division 01 General Requirements
Page 221 Section 011100 Summary of Work
Page 225 Section 011416 Coordination with Owner's Operations
Page 233 Section 011416-A Schedule of Tie-Ins
Page 235 Section 011416-B Schedule of Shutdowns
Page 237 Section 011419 Use of Site
Page 239 Section 012100 Allowances
Page 243 Allowance Authorization
Page 245 Section 012513 Substitution Procedures After Execution of Contract
Page 248 Substitution Request
Page 257 Section 012600 Contract Modification Procedures
Page 266 Request for Interpretation
Page 267 Proposal Request
Page 268 Change Proposal
Page 269 Section 012973 Schedule of Values
Page 275 Section 012976 Progress Payment Procedures
Page 278 List of Subcontractors & Suppliers
Page 281 Section 013113 Project Coordination
Page 285 Section 013119 Project Meetings
Page 291 Section 013126 Electronic Communication Protocols
Page 297 Section 013216.SMALL Construction Progress Schedule
Page 305 Section 013300 Submittal Procedures
Page 317 Section 013300A Transmittal for Submittal
Page 319 Section 014200 References
Page 331 Section 015105 Temporary Utilities
Page 337 Section 015211 Engineer's Field Office
Page 347 Section 015705 Temporary Controls
Page 357 Section 016103 Equipment - Basic Requirements
Page 376 Exhibit A Manufacturer Field Service Report
Page 381 Section 016400 Owner-Furnished Products
Page 385 Section 016500 Product Delivery Requirements
Page 389 Section 016600 Product Storage & Handling Requirements
Page 395 Section 017114 Mobilization & Demobilization
Page 397 Section 017133 Protection of the Work & Property
Page 405 Section 017320 Openings & Penetrations in Construction
Page 413 Section 017329 Cutting & Patching
Page 419 Section 017400 Cleaning
Page 423 Section 017500 Checkout & Start-Up Procedures
Page 429 Section 017719 Closeout Requirements
Page 432 Sample Letter for Contractor's Use in Requesting Inspection for Substantial Completion
Page 434 Sample Partial Checklist to Identify Readiness for Final Inspection
Page 438 Sample Letter for Contractor's Use in Requesting Final Inspection
Page 439 Section 017823 Operation & Maintenance Data
Page 447 Attachment 1 Equipment Record - Equipment Data & Spare Parts Summary
Page 448 Attachment 2 Equipment Record - Recommended Maintenance Summary
Page 449 Attachment 3 Equipment Record - Lubrication Summary
Page 451 Section 017836 Warranties
Page 455 Section 017839 Project Record Documents
Page 461 Section 017843 Spare Parts & Extra Materials
Page 463 Section 017923 Instruction of Operation & Maintenance Personnel
Page 469 Section 018110 Wind & Seismic Design Criteria
Page 471 Section 018133 Cyber Security Requirements
Page 477 Division 02 Existing Conditions
Page 479 Section 024100 Demolition
Page 489 Division 03 Concrete
Page 491 Section 030005 Concrete
Page 503 Section 031519 Anchorage to Concrete
Page 511 Division 04 Masonry
Page 513 Section 040120 Masonry Cleaning
Page 515 Section 040513 Masonry Mortar & Grout
Page 519 Section 040523 Masonry Accessories
Page 523 Section 040550 Cold & Hot Weather Masonry Construction
Page 525 Section 042200 Concrete Masonry
Page 531 Division 05 Metals
Page 533 Section 055000 Metal Fabrications
Page 547 Section 055243 Aluminum Railings
Page 553 Division 06 Wood, Plastics, & Composites
Page 555 Section 061000 Rough Carpentry
Page 559 Division 07 Thermal & Moisture Protection
Page 561 Section 072100 Building Insulation
Page 563 Section 072746 Self-Adhering Air Barrier - Vapor Permeable
Page 567 Section 074213 Preformed Metal Wall Panels
Page 571 Section 075325 Adhered Elastomeric (EPDM) Sheet Roofing
Page 577 Section 076200 Flashing & Sheet Metal
Page 581 Section 078400 Firestopping (Not Used)
Page 589 Section 079200 Joint Sealants
Page 595 Division 08 Openings
Page 597 Section 081100 Hollow Metal Doors & Frames
Page 601 Section 083100 Access Doors
Page 605 Section 087000 Finish Hardware
Page 613 Section 089000 Louvers & Vents
Page 615 Division 09 Finishes
Page 617 Section 092216 Non-Structural Metal Framing
Page 621 Section 092900 Gypsum Board
Page 625 Section 099100 Architectural Painting
Page 635 Section 099600 High Performance Industrial Coatings
Page 653 Division 10 Specialties
Page 655 Section 101400 Identification Devices
Page 667 Section 101423 Signage
Page 671 Section 104433 Fire Protection Specialties
Page 673 Division 23 Heating, Ventilating, & Air Conditioning (HVAC)
Page 675 Section 230593 HVAC Systems - Balancing & Testing
Page 679 Section 230900 Instrumentation & Control for HVAC Systems
Page 683 Section 233100 HVAC - Ductwork
Page 691 Section 233400 HVAC - Fans
Page 697 Section 238000 HVAC - Equipment
Page 703 Division 26 Electrical
Page 705 Section 260500 Electrical - Basic Requirements
Page 715 Section 260519 Wire & Cable - 600 Volt & Below
Page 725 Section 260526 Grounding & Bonding
Page 729 Section 260533 Raceways & Boxes
Page 743 Section 260543 Electrical - Exterior Underground
Page 749 Section 260548 Electrical Seismic Restraint Systems
Page 753 Section 260574 Short Circuit & Coordination Study, & Arc Flash Report
Page 757 Section 260813 Acceptance Testing
Page 763 Section 260916 Control Equipment Accessories
Page 771 Section 262416 Panelboards
Page 775 Section 262419 Motor Control Equipment
Page 783 Section 262726 Wiring Devices
Page 789 Section 262800 Overcurrent & Short Circuit Protective Devices
Page 793 Section 262816 Safety Switches
Page 796 Exhibit A Safety Switch Summary Table
Page 797 Section 262923 Variable Frequency Drives - Low Voltage
Page 809 Section 263214 Engine Generator - Diesel
Page 821 Section 263600 Transfer Switches
Page 825 Division 31 Earthwork
Page 827 Section 311000 Site Clearing
Page 831 Section 312333 Trenching, Backfilling, & Compacting for Utilities
Page 837 Section 312500 Erosion & Sedimentation Controls
Page 841 Section 313219 Geotextiles
Page 845 Division 32 Exterior Improvements
Page 847 Section 321216 Asphaltic Concrete Vehicular Paving
Page 849 Section 321540 Crushed Stone Surfacing
Page 851 Division 40 Process Interconnections
Page 853 Section 400500 Pipe & Pipe Fittings - Basic Requirements
Page 869 Section 400507 Pipe Support Systems
Page 877 Section 400519 Ductile Iron Process Pipe
Page 883 Section 400523 Stainless Steel Process Pipe & Tubing
Page 889 Section 400524 Pipe - Steel
Page 895 Section 400531 Pipe - Plastic
Page 899 Section 400551 Common Requirements for Process & Utility Valves
Page 905 Section 400552 Miscellaneous Valves
Page 909 Section 400557 Actuators for Process Valves & Gates
Page 917 Section 400561 Gate Valves
Page 919 Section 400562 Plug Valves
Page 921 Section 400563 Ball Valves
Page 925 Section 400564 Butterfly Valves
Page 929 Section 401015 Fiberglass Reinforced Plastic Duct
Page 937 Section 404113 Heat Tracing Cable
Page 941 Section 404200 Pipe, Duct & Equipment Insulation
Page 949 Section 406113 Process Control System General Requirements
Page 961 Section 406121 Process Control System Testing
Page 967 Section 406143 Surge Protection Devices for Instrumentation & Control Equipment
Page 973 Section 406196 Process Control Descriptions
Page 987 Section 406200 Primary Meters & Transmitters
Page 1003 Section 406343 Programmable Logic Controllers
Page 1009 Section 406343A PLC Component Table - Attachment A
Page 1011 Section 406343B PLC Input / Output Usage Table - Attachment B
Page 1015 Section 406700 Control System Equipment Panels & Racks
Page 1031 Section 407800 Panel Mounted Instruments
Page 1037 Division 41 Material Processing & Handling Equipment
Page 1039 Section 412223 Hoists, Trolleys, & Monorails
Page 1045 Division 43 Process Gas & Liquid Handling, Purification, & Storage Equipment
Page 1047 Section 431114 High Speed Turbo Blower
Page 1063 Section 431513 Blower Intake & Turbine Air Filters
Page 1067 Division 46 Water & Wastewater Equipment
Page 1069 Section 462110 Septage Cylindrical Bar Screen
Page 1081 Section 462363 Grit Classifier & Hydrocyclone System
Page 1089 Section 464323 Plow Scraper Circular Primary Clarifier Equipment
Page 1099 Section 466656 Open Channel Low Pressure High Intensity UV Treatment Equipment
Page 1111 Section 467633 Centrifuge Installation
Page 1115 Decanter Centrifuge - Installation Data
Page 1163 Technical Submittal HST Turbo Compressors Revision 0
Page 1613 Appendix B Procurement Specification
Page 1631 Appendix C UV Proposal
Page 1717 Appendix D UV Procurement Documents
Page 1718 Procurement Documents Project Manual
Page 1720 Section 000001 Table of Contents - UV Procurement Documents
Page 1722 Division 00 Procurement & Contracting Requirements
Page 1724 Section 000107 Seals & Signatures
Page 1726 Instructions to Bidders for Procurement Contract
Page 1738 Bid Form for Procurement Contract
Page 1746 Agreement Between Buyer & Seller for Procurement Contract
Page 1762 Exhibit A Assignment of Procurement Contract, Consent to Assignment & Acceptance of Assignment
Page 1763 Exhibit B Surety's Consent to Assignment
Page 1764 Payment Bond for Procurement Contract
Page 1770 Section 006113.13 Performance Bond
Page 1774 Section 006113.16 Payment Bond
Page 1778 Standard General Conditions of the Procurement Contract
Page 1820 Supplementary Conditions of the Procurement Contract
Page 1830 Division 01 General Requirements
Page 1832 Section 011100 Summary of Work
Page 1836 Section 012200 Measurement & Payment
Page 1838 Section 012600 Contract Modification Procedures
Page 1843 Request for Interpretation
Page 1844 Proposal Request
Page 1845 Change Proposal
Page 1846 Section 013126 Electronic Communication Protocols
Page 1848 Section 013300 Submittal Procedures
Page 1856 Transmittal for Submittal
Page 1858 Section 016103 Equipment - Basic Requirements
Page 1880 Section 016550 Product Delivery, Storage & Handling for Procurement Contracts
Page 1884 Section 017503 System Start-Up & Acceptance
Page 1894 Section 017823 Operation & Maintenance Data
Page 1902 Attachment 1 Equipment Data & Spare Parts Summary
Page 1903 Attachment 2 Recommended Maintenance Summary
Page 1904 Attachment 3 Lubrication Summary
Page 1906 Section 017923 Instruction of Operation & Maintenance Personnel
Page 1912 Section 018110 Wind & Seismic Design Criteria
Page 1916 Division 05 Metals
Page 1918 Section 055000 Metal Fabrications
Page 1924 Division 10 Specialties
Page 1926 Section 101400 Identification Devices
Page 1932 Division 40 Process Interconnections
Page 1934 Section 400557 Actuators for Process Valves & Gates
Page 1942 Section 400559 Fabricated Stainless Steel Slide Gates
Page 1946 Section 406113 Process Control Systems General Requirements
Page 1952 Section 406700 Control System Equipment Panels & Racks
Page 1964 Division 46 Water & Wastewater Equipment
Page 1966 Section 466656 Open Channel Low Pressure High Intensity Ultraviolet Treatment Equipment