Olney Avenue Sewer Replacement, West Sound Utility District, Port Orchard, WA - Specs

Order Prints   FastBid Help

This document has 271 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 3 Certificate Page
Page 5 Table of Contents
Page 7 Invitation for Bids
Page 9 Instructions to Bidders
Page 11 Bidder's Checklist
Page 13 Bid Proposal
Page 17 Bid Bond Form
Page 19 Subcontractor List
Page 21 Bidder's Experience Record
Page 23 District Public Works Contract
Page 27 Performance & Payment Bond
Page 29 Insurance Requirements
Page 35 General Conditions
Page 65 Prevailing Wage Rates
Page 67 Section 01100 Summary of Work
Page 69 Section 01140 Special Safety Measures
Page 71 Section 01150 Construction Surveying
Page 73 Section 01200 Measurement & Payment
Page 97 Section 01300 Project Data Submittals
Page 105 Section 01310 Project Meetings
Page 107 Section 01320 Project Scheduling
Page 113 Section 01410 Regulatory Requirements
Page 115 Section 01450 Material Testing & Quality Control
Page 121 Section 01505 Mobilization & Demobilization
Page 123 Section 01530 Temporary Sewer Bypassing
Page 129 Section 01550 Traffic Control
Page 133 Section 01620 Protection of Materials
Page 135 Section 01720 Record Drawings
Page 137 Section 01740 Cleanup
Page 141 Section 01780 Closeout Procedures
Page 145 Section 02050 Demolition & Salvaging
Page 149 Section 02110 Site Clearing
Page 151 Section 02140 Dewatering
Page 155 Section 02150 Excavation Support Systems
Page 157 Section 02210 Earthwork
Page 163 Section 02220 Spill Prevention Control & Countermeasure Plan
Page 165 Section 02222 Excavating, Backfilling & Compacting for Utilities
Page 173 Section 02370 Temporary Erosion & Sedimentation Control
Page 177 Section 02530 Sanitary Sewer
Page 183 Section 02533 Television Inspection
Page 187 Section 02543 Pipe Bursting
Page 195 Section 02570 Hot Mix Asphalt (HMA)
Page 201 Section 02605 Manholes
Page 211 Section 02990 Landscape Restoration
Page 217 Appendix A Washington State Prevailing Wage Rate Schedule
Page 219 Washington State Prevailing Wage Rates - Kitsap County
Page 267 Appendix B Inadvertent Discovery Plan