Project #E1893          Bid Date: 8/14/2025 @ 11:00 am PDT

Central Reservoir Seismic Retrofit, Cedar River Water & Sewer District, Maple Valley, WA

$1,900,000 to $2,100,000

Low Bid:
Bids Received: 4
Apparent Low BidMSI$ 2,732,988.54
2ndTBailey$ 2,804,865.09
3rdRAZZ Construction $ 2,906,592.00

Plans
Specs
Addendum #1
Addendum #1 Plans
Addendum #2
Addendum #2 Orignal Design Plans
Addendum #3
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Cedar River Water & Sewer District
18421 SE Petrovitsky Road
Renton, WA 98058

Issued by:
www.bxwa.com

Prebid: 7/24 @ 10:00 am at 20029 SE 206th Street (project site)

Description:
Work to be performed includes:
• Provide modified foundation
• Remove and replace reservoir appurtenances (manway, overflow pipe, sample lines, guardrails, vent
• Reservoir coatings
• Seal welding
• Install sixty-three 3-inch-diameter anchors to meet uplift requirements
• Install shell stiffeners
• Replace connections on the existing access platforms to secure grating to supports
• Provide mechanical piping improvements
• Provide overflow pond and piping
• Provide electrical and mechanical upgrades