Alderwood Estates Water Main and Service Line Replacement Project, Valley Water District, Pierce County, WA
Low Bid:
| Bids Received: 5 | ||
| Apparent Low Bid | Pape & Sons Construction | $ 1,494,543.60 |
| 2nd | Raudenbush Earthworks | $ 1,580,852.87 |
| 3rd | HCON Incorporatred | $ 1,681,313.92 |
View self registered Bidders List
Builders Exchange of Washington, Inc. Subs and Suppliers
Owner:
Valley Water District
14515 Pioneer Way E
Puyallup, WA 98372
Contact: Sean Vance
sean@valleywaterdistrict.com
Issued by:
www.bxwa.com
Engineer:
Parametrix
1019 39th Ave SE Suite 100
Puyallup, WA 98374
253-604-6600
Fax: 855-542-6353
Contact: John Lewis Wright III, PE
jwright@parametrix.com
Description:
This Contract provides for water main improvements within the Valley Water District. The project is located within Pierce County right-of-way. Work will consist of furnishing and installing up to 195 residential service line replacements, approximately 3,150 linear feet of 8-Inch ductile iron water main, and approximately 305 linear feet of 2-inch polyline water main, and all associated water system materials including water main, fittings, valves, fire hydrants, and water service materials, as well as traffic control and surface restoration, and material testing.