Project #AW29          Bid Date: 3/18/2025 @ 1:30 pm PDT

2025 Sewer Relining Program, Alderwood Water and Wastewater District, Lynnwood, WA #S2402

$7,000,000 to $7,400,000

Low Bid:
Bids Received: 2
Apparent Low BidIron Horse, LLC$ 6,568,703.00
2ndInsituform Technologies LLC$ 7,490,719.00

Schedule A AWWD Plans
Schedule B SLWSD Plans
Schedule C MWWD Plans
Schedule D Bothell Plans
Schedule E Lynnwood Plans
Schedule F Mukilteo Plans
Specs
Addendum #1
Addendum #2
Bid Tabulation - Revised

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Alderwood Water Wastewater District
3626 156th Street SW
Lynnwood, WA 98087

Contact: Devin Hancock, EIT
206-316-9147
devin.hancock@awwd.com

Issued by:
www.bxwa.com

Description:
The project work is located in Snohomish County and King County, WA. The purpose of this project is to:
• Install approximately 65,000 ± linear feet of cured in place sanitary sewer and storm sewer main in sizes varying from 8-inches to 18-inches;
• Install cured in place pipe in approximately 26 sanitary sewer laterals, each up to 5-feet in length;
• Install chemical grout into approximately 663 lateral connections to sewer mains.
Project work also includes temporary traffic control, erosion and sedimentation control, bypass pumping, site restoration, and other associated work items.