Project #AW30          Bid Date: 4/3/2025 @ 11:00 am PDT

Nike Reservoirs 1 and 2 Recoating Project, Alderwood Water and Wastewater District, Bothell, WA #W2313

$4,500,000 to $5,000,000

Low Bid:
Bids Received: 4
Apparent Low BidFD Thomas, Inc.$ 3,882,800.00
2ndSkyway USA Inc.$ 4,380,557.00
3rdPurcell P&C LLC$ 4,591,500.00

Plans
Specs
Appendices
Appendices - Appendix E Plans
Addendum #1
Addendum #2
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Alderwood Water Wastewater District
3626 156th Street SW
Lynnwood, WA 98087

Contact:
David MacDonald, Project Representative
425-743-4605
dmacdonald@awwd.com

Issued by:
www.bxwa.com

Prebid: 3/27 @ 2:30 pm at 22608 4th Ave W, Bothell, WA

Description:
The work under this Contract generally includes full containment, environmental controls, surface preparation and recoating of the interior and exterior of Nike Reservoir 1 and the interior of Nike Reservoir 2 – both steel potable water reservoirs. The dimensions of Nike Reservoir 1 are 114-feet in diameter and 32-feet in height, with an approximate storage volume of 2.44 million gallons. The dimensions of Nike Reservoir 2 are 150-feet in diameter and 30-feet in height, with an approximate storage volume of 3.5 million gallons. The location of the work is 22608 4th Ave W, which is at the northwest quadrant of the intersection of 228th St SW and 4th Ave W.