Shoreline Community College Health Sciences Advanced Manufacturing Classroom Complex, Shoreline, WA - Addendum #3 Bid Manual    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 221 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 GC/CM Bid Manual
Page 2 Table of Contents
Page 4 Invitation to Bid
Page 6 Project Summary
Page 8 Instructions to Bidders
Page 15 Work Plan
Page 21 Project Specific Requirements
Page 39 Standard Subcontractor Safety Requirements
Page 44 Bid Package Responsibility Matrix
Page 51 Bidder's Checklist
Page 52 Bid Package 2.0 - Demolition
Page 58 Bid Package 3.0 - Concrete and Rough Carpentry
Page 65 Bid Package 4.0 - Masonry Veneer
Page 71 Bid Package 5.0 - Structural and Miscellaneous Steel
Page 77 Bid Package 6.0 - Casework and Millwork
Page 83 Bid Package 7.1 - Membrane Roofing
Page 89 Bid Package 7.2 - Siding and Flashing
Page 95 Bid Package 8.0 - Doors and Hardware
Page 101 Bid Package 8.1 - Windows and Glazing
Page 107 Bid Package 8.2 - Translucent Skylight System
Page 112 Bid Package 9.0 - Light Gauge Framing and GWB
Page 118 Bid Package 9.1 - Ceilings and Acoustical
Page 124 Bid Package 9.2 - Flooring and Tiling
Page 129 Bid Package 9.3 - Painting
Page 135 Bid Package10.0 - Miscellaneous Specialties
Page 141 Bid Package11.0 - Laboratory Casework and Specialties
Page 147 Bid Package 14.0 - Elevator
Page 152 Bid Package 21.0 - Fire Protection
Page 158 Bid Package 26.0 - Electrical, Telecom, and Security Complete
Page 165 Bid Package31.0 - Earthwork and Utilities
Page 172 Bid Package 32.0 - Asphalt Paving
Page 177 Bid Package 32.1 - Concrete Paving, Curbs, and Walks
Page 183 Bid Package 32.2 - Site Accessories and Improvements
Page 188 Bid Package 32.3 - Landscaping
Page 194 Bid Package 32.4 - Tree, Plant, and Soil Protection
Page 199 Exhibit A Site Logistics Plan
Page 200 Exhibit B CPM Schedule
Page 201 Exhibit C Form Standard Subcontract Terms & Conditions
Page 202 Exhibit D Owner / Contractor Agreement
Page 203 Exhibit E Drawings
Page 213 Exhibit F Specifications
Page 220 Exhibit G Apprentice Utilization Form
Page 221 Exhibit H BIM Execution Plan