Printable Drawing List

Illahee Middle School, Federal Way, WA - Addendum #2 Plans

G0.10 Drawing Index & Project Data
G4.10 Site Details
HM1.01 Hazardous Materials Plan Building 100
HM1.02 Hazardous Materials Plan Building 200
HM1.03 Hazardous Materials Plan Building 300
HM1.04 Hazardous Materials Plan Building 400
HM1.05 Hazardous Materials Plan Building 500
HM1.06 Hazardous Materials Plan Building 600
HM1.07 Hazardous Materials Plan Building 700
HM1.08 Hazardous Materials Plan Building 800
HM1.09 Hazardous Materials Plan Building 900
C1.01 Demolition Plan North
C1.02 Demolition Plan South
C2.01 TESC Plan North
C2.10 TESC Notes and Details
C3.01 Grading Plan North
C3.02 Grading Plan South
C4.01 Horizontal Control and Paving Plan North
C4.02 Horizontal Control and Paving Plan South
C5.03 Storm Drainage Profiles
C5.05 Storm Drainage Profiles
C5.06 Storm Vault Plan and Profiles
C5.11 Storm Drainage Notes and Details
C7.10 Frontage TESC and Demolition Plan
C7.20 1st Avenue South Frontage Improvement Plan
C7.21 SW 360th Street Frontage Improvement Plan
C7.31 Frontage Improvement Details
L1.01 Site Improvement Plan
L1.02 Site Improvement Plan
L1.03 Site Improvement Plan
L1.04 Overall Tree Retention Plan
L2.01 Landscape Plan
L2.03 Landscape Plan
L2.06 Soils Plan Enlargement
L3.01 Irrigation Plan Enlargement
L3.03 Irrigation Plan Enlargement
A2.31 Roof Plan - Area A
A2.32 Roof Plan - Area B
A2.33 Roof Plan - Gym
A5.10 Exterior Window / Storefront / Skylight / Louver Types
A5.23 Exterior Opening Details
A5.52 Roof Details
A5.53 Roof Details
A5.54 Roof Details
A6.21 Enlarged Stair Plans and Sections
A6.23 Stair Details
A6.24 Stair Details
A6.25 Enlarged Ship Ladders and Ramps
A6.31 Enlarged Elevator Plans, Sections and Details
A7.19 Interior Elevations - Area B Entry & Corridor
A7.20 Interior Elevations - L2 Area B Corridors
A7.22 Interior Elevations - Area B LRC
A7.26 Interior Elevations - Area B Orchestra & Band
A8.11 First Floor Reflected Ceiling Plan - Area A
A8.12 First Floor Reflected Ceiling Plan - Area B
A8.21 Second Floor Reflected Ceiling Plan - Area A
A8.22 Second Floor Reflected Ceiling Plan - Area B
A9.51 Interior Details
A9.52 Interior Details
A10.12 First Floor Finish Plan - Area B
A10.12.1 First Floor Interior Finish Schedule - Area B
A11.11 First Floor Signage Plan - Area A
A11.14 First Floor Signage Schedule - Main Building
A11.31 Signage Details
A11.32 Environmental Graphics - Main Building
S2.12 Second Floor Framing & Low Roof Framing - Area B
S2.31 Roof Framing Plan - Area A
S2.32 Roof Framing Plan - Area B
S6.05 Roof Framing Details
S6.06 Roof Framing Details
M0.03 Mechanical Equipment Schedules
M0.05 Mechanical Equipment Schedules
M0.08 Mechanical Equipment Schedules
M3.03-A HVAC First Floor Plan - Gym Alternate
M4.03 HVAC Piping First Floor Plan - Gym
M4.03-A HVAC Piping First Floor Plan - Gym Alternate
M9.03 Mechanical Details and Diagrams
M9.07 Mechanical Details and Diagrams
M10.09 Mechanical Controls
E0.02 Light Fixture Schedule
E0.03 Light Fixture Schedule
ED1.01 Electrical Site Demolition Plan
E1.01 Electrical Site Plan
E1.03 Systems Site Plan
E3.01 Level 1 Power Plan - Area A
E3.02 Level 1 Power Plan - Area B
E3.06 Electrical Roof Plan
E3.11 Level 2 Power Plan - Area A
E3.12 Level 2 Power Plan - Area B
E6.01 Electrical One-Line Diagram
E6.12 Electrical Panel Schedules
TL210 Theater Lighting - Control & Distribution Plans
TL510 Theater Lighting - Control Equipment Details
TL710 Theater Lighting - Control Interconnect Diagram
TL810 Theater Lighting - Equipment Schedules
TP110 Theater Production - Light Plot & Schedules
AV0.01 AV Legend, Abbreviations and General Notes
AV2.13 First Floor Plan - Gym
AV7.01 AV Elevations
AV10.01 AV Block Diagrams