Printable Drawing List

JSCEE Central Kitchen Renovation Phase II, Seattle, WA - Exhibit E.4 - Plumbing As-Built Plans

P1.1 First Floor - Plumbing Plan
P1.2 Second Floor - Plumbing Plan
P1.3 Third Floor - Plumbing Plan
P1.4 First and Second Floor - Shops Building Plan
P2.1 Enlarged Plumbing Plan - Kitchen
P2.2 First Floor - Enlarged Plumbing Plan
P2.3 Second Floor - Enlarged Plumbing Plan
P2.4 Third Floor - Enlarged Plumbing Plan
P2.5 Enlarged Plan and Sections - Boiler Room
P4.1 Plumbing Details
P4.2 Plumbing Details
P4.3 Plumbing Details
P5.1 Plumbing Schedules
JPF-P2.1-U2 Underground Plumbing Kitchen West Trench Cut As-Built
JPF-BOILER Boiler Room - Pad Locations
JPF-P1.1-A First Floor Plumbing Plan - As-Built
JPF-P1.1-B First Floor Plumbing Plan - As-Built
JPF-P1.1-C First Floor Plumbing Plan - As-Built
JPF-P1.1-D First Floor Plumbing Plan - As-Built
JPF-P1.1-E First Floor Plumbing Plan - As-Built
JPF-P1.1-F First Floor Plumbing Plan - As-Built
JPF-P1.1-G First Floor Plumbing Plan - As-Built
JPF-P1.2-A Second Floor Piping Plan Area A As-Built
JPF-P1.2-B Second Floor Piping Plan Area B As-Built
JPF-P1.2-C Second Floor Piping Plan Area C As-Built
JPF-P1.2-D Second Floor Piping Plan Area D As-Built
JPF-P1.2-E Second Floor Piping Plan Area E As-Built
JPF-P1.2-F Second Floor Piping Plan Area F As-Built
JPF-P1.2-G Second Floor Piping Plan Area G As-Built
JPF-P1.3 Third Floor Drains / Roof Openings As-Built