Page 1 Cover Page
Page 2 Section 000110 Table of Contents
Page 9 Division 21 Fire Suppression
Page 10 Section 210000 Fire Suppression Work Specified in Division 23
Page 11 Section 211000 Automatic Fire Suppression Systems
Page 25 Division 22 Plumbing
Page 26 Section 220000 Plumbing Work Specified in Division 23
Page 27 Section 220800 Commissioning of Plumbing Systems
Page 31 Section 221116 Domestic Water System
Page 46 Section 221120 Plumbing Valves
Page 54 Section 221123 Plumbing Pumps
Page 57 Section 221300 Soil, Waste, Vent, and Storm Drain Piping Systems
Page 67 Section 223000 Plumbing Equipment
Page 72 Section 224000 Plumbing Fixtures
Page 85 Section 226600 Acid Waste and Vent Piping System
Page 91 Division 23 Heating, Ventilating, and Air Conditioning (HVAC)
Page 92 Section 230130 Air Duct Cleaning
Page 97 Section 230500 General Provisions
Page 114 Section 230505 Project Closeout and System Start-Up
Page 118 Section 230510 Basic Materials and Methods
Page 134 Section 230512 Indoor Air Quality - HVAC
Page 136 Section 230513 Electrical Provisions for Mechanical Work
Page 142 Section 230520 Mechanical Demolition
Page 145 Section 230548 Vibration Isolation
Page 156 Section 230550 Seismic Control
Page 162 Section 230593 Testing, Adjusting, and Balancing
Page 172 Section 230700 Mechanical Insulation
Page 186 Section 230800 Commissioning of Mechanical Systems
Page 191 Section 230810 Systems Training
Page 197 Section 230820 Systems Operations and Maintenance Manuals
Page 202 Section 230900 Direct-Digital Control System for Plumbing and HVAC
Page 263 Section 230910 Energy Analytics System
Page 277 Section 230915 Variable Frequency Drives
Page 288 Section 231123 Natural Gas Piping Systems
Page 294 Section 232113 Hydronic Piping Systems
Page 310 Section 232116 Piping Specialties
Page 322 Section 232120 Hydronic Valves
Page 328 Section 232123 Hydronic Pumps
Page 332 Section 232140 Vertical Bore Hole Geothermal Loop Heat Exchanger Piping
Page 343 Section 232200 Steam and Steam Condensate Return Piping and Equipment
Page 347 Section 232300 Refrigerant Piping Systems
Page 352 Section 232500 Water Treatment
Page 359 Section 233100 Air Distribution
Page 374 Section 233300 Air Distribution Accessories
Page 385 Section 233400 Air Distribution Equipment
Page 401 Section 233700 Air Devices
Page 405 Section 234100 Filters
Page 408 Section 235100 Flues and Stacks
Page 411 Section 235200 Boilers
Page 416 Section 235700 Heat Transfer
Page 420 Section 238100 Packaged HVAC Equipment
Page 436 Section 238200 Terminal Heat Transfer Equipment
Page 439 Division 26 Electrical
Page 440 Section 260010 Electrical Provisions
Page 455 Section 260050 Basic Electrical Materials and Methods
Page 460 Section 260519 Wire and Cable (600V and Less)
Page 464 Section 260526 Grounding and Bonding for Electrical Systems
Page 468 Section 260533 Raceway and Boxes
Page 476 Section 260543 Underground Ducts and Raceways
Page 481 Section 260548 Vibration and Seismic Controls for Electrical Systems
Page 487 Section 260573 Coordination Studies
Page 503 Section 260800 Commissioning of Electrical Systems
Page 507 Section 260913 Electrical Power Monitoring
Page 512 Section 260923 Lighting Control Devices
Page 516 Section 262213 Low-Voltage Transformers
Page 520 Section 262413 Switchboards
Page 527 Section 262416 Panelboards
Page 532 Section 262726 Wiring Devices
Page 537 Section 262813 Fuses
Page 540 Section 262816 Enclosed Switches and Circuit Breakers
Page 544 Section 262913 Manual and Magnetic Motor Controllers
Page 548 Section 263100 Solar Photovoltaic Utility Grid-Tied System
Page 556 Section 264313 Surge Protective Devices for Low-Voltage Electrical Power Circuits
Page 560 Section 265119 LED Interior Lighting
Page 565 Section 265213 Emergency and Exit Lighting
Page 569 Section 265619 LED Exterior Lighting
Page 574 Section 265668 Exterior Athletic Lighting
Page 581 Section 267173 Electrical Utility Services
Page 583 Division 27 Communications
Page 584 Section 270528 Pathways for Communications Systems
Page 587 Section 270530 Pathways for AV Systems
Page 590 Section 270553 Identification for Communications Systems
Page 594 Section 271323 Communications Optical Fiber Cabling
Page 604 Section 271513 Communications Copper Horizontal Cabling
Page 616 Section 274116 AV Systems
Page 632 Section 275123 Classroom Sound Amplification System
Page 639 Section 275313 Intercom and Clock System
Page 647 Section 275320 Distributed Antenna System
Page 659 Division 28 Electronic Safety and Security
Page 660 Section 280800 Commissioning of Electronic Safety and Security
Page 663 Section 281300 Access Control System
Page 678 Section 282000 Video Surveillance
Page 680 Section 284621 Addressable Fire-Alarm Systems
Page 702 Division 31 Earthwork
Page 703 Section 311000 Site Preparation
Page 716 Section 312200 Earthwork
Page 733 Section 314133 Trench Safety
Page 734 Division 32 Exterior Improvements
Page 735 Section 321216 Asphalt Paving
Page 740 Section 321313 Concrete Paving
Page 746 Section 321313.23 Concrete Paving Surface Treatment
Page 749 Section 321540 Permeable Crushed Rock Base
Page 754 Section 321723 Pavement Markings
Page 757 Section 321813 Synthetic Grass Surfacing
Page 769 Section 321823.49 Elastic Layer
Page 773 Section 323000 Site Improvements
Page 775 Section 323113 Chain Link Fences and Gates
Page 779 Section 323800 Irrigation
Page 790 Section 323900 Planting
Page 805 Division 33 Utilities
Page 806 Section 333000 Sanitary Sewer
Page 810 Section 334000 Storm Drainage
Page 817 Section 334600 Subdrainage