Reservoir Park Sport Court Replacement, City of Redmond, WA #2331 & 2316 - Specs    

Order Prints   FastBid 3 Help  

FastBid requires JavaScript to run. Please call 425-258-1303 for more information.

This document has 252 pages. Here are the ones with descriptions:
Click on any to load whole document, opened to the selected page.
Then use the sheet list navigation buttons to load the other pages.

Page 1 Cover Page
Page 2 Table of Contents
Page 3 Call for Bids
Page 5 Information & Checklist for Bidders
Page 8 Bid Proposal
Page 15 Bid Proposal Signature Page
Page 16 Bid Security
Page 17 Non-Collusion Affidavit
Page 18 Subcontractor List
Page 19 Responsible Bidder Determination Form
Page 21 Certification of Compliance with Wage Payment Statutes
Page 22 Employee Apprenticeship Program (EAP) Utilization Plan
Page 25 Agreement
Page 27 Declaration of Authority to Sign
Page 28 Public Works Payment Bond
Page 30 Performance Bond
Page 32 Declaration of Option for Management of Statutory Retained Percentage
Page 33 Interest Bearing Escrow Account / Escrow Agreement
Page 35 Bond in Lieu of Retained Funds
Page 37 Special Provisions
Page 39 Introduction to the Special Provisions
Page 41 Division 1 General Requirements
Page 94 Division 2 Earthwork
Page 102 Division 4 Bases
Page 104 Division 5 Surface Treatments & Pavements
Page 130 Division 6 Structures
Page 137 Division 7 Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains & Conduits
Page 143 Division 8 Miscellaneous Construction
Page 165 Division 9 Materials
Page 168 Appendix A Prevailing Wage Rates
Page 169 Washington State Prevailing Wage Rates - King County
Page 181 Benefit Code Key
Page 199 Appendix B Standard Plans & Details
Page 224 Appendix C Contacts
Page 228 Appendix D Reservoir Park As-Builts
Page 247 Appendix E Probounce Specifications