Project #BLV5          Bid Date: 11/12/2026 @ 10:00 am PST

2027 Phase 1 Water Main Replacement, City of Bellevue, WA #26043

$7,000,000 to $7,700,000

Low Bid:
Bids Received: 7
Apparent Low BidKar-Vel Construction $ 5,584,862.92
2ndFury Site Works$ 5,656,782.41
3rdPivetta Brothers Construction$ 6,260,269.53

Plans
Specs
Appendices
Bid Results
Bid Tabulation

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
City of Bellevue
Contracting Services Division
450 - 110th Avenue NE
Bellevue, WA 98004
425-452-4870
bellevuewa.gov

Contact:
Jim Stockwell, Project Engineer
425-452-4868
jstockwell@bellevuewa.gov

Issued by:
www.bxwa.com

Notes:
Bid Opening Information:
https://teams.microsoft.com/meet/265872471467479?p=Nj1QiADoYQ6jqM9yK9
Meeting ID: 265 872 471 467 479
Passcode: g7de9do7

Or call in (audio only)
+1 206-452-7011,,534753732#United States, Seattle
Phone Conference ID: 534 753 732#

Description:
Work contemplated to be performed under this contract is as follows:
• Constructing approximately 10,820 LF of ductile iron water mains,
• Installing new fire hydrant assemblies,
• Installing replacement water services,
• Constructing two replacement Pressure Reducing Valve (PRV) Stations in a concrete vault,
• Construction dewatering,
• Relocating existing utilities (as required),
• Abandoning asbestos cement pipe,
• Restoring surface conditions, including asphalt trench patching and concrete curbs, gutters, and sidewalks,
• Performing traffic control,
• Other work as required to complete the project