Lift Station 1 Improvements Project, Cross Valley Water District, Snohomish, WA - Plans
G-1 Cover Sheet
G-2 Index of Drawings and General Notes
G-3 Legend, Abbreviations, and Designation
C-1 Civil Site Plan and TESC
C-2 TESC Details
D-1 Lift Station Exterior Demolition Plan
D-2 Lift Station Upper Level Demolition Plan
D-3 Lift Station Mid Level Demolition Plan
D-4 Lift Station Low Level Demolition Plan
D-5 Demolition Sections
S-1 Structural General Notes
S-2 Structural General Notes
S-3 Canopy Roof and Slab Plan
S-4 Details
S-5 Stair and Railing Details
S-6 Concrete Wall Repair Details
M-1 Lift Station Upper Level Mechanical Plan
M-2 Lift Station Lower Level Mechanical Plan
M-3 Mechanical Sections
E-1 Electrical Exterior Plan
E-2 Electrical Upper Level Plan
E-3 Electrical Mid Level Plan
E-4 Electrical Low Level Plan
E-5 Electrical Details
E-6 Electrical One Line Diagram
E-7 Electrical Schedules
I-1 Process and Instrumentation Legend
I-2 Process and Instrumentation
Order Prints
Drawing List
FastBid 3 Help
FastBid 3 Help
When using the measuring tool, be sure to
verify the set scale
with a known distance such as a dimension or a door.
FastBid requires JavaScript to run. Please call 425-258-1303 for more information.