Project #E1931          Bid Date: 12/15/2026 @ 10:00 am PST

Lift Station 1 Improvements Project, Cross Valley Water District, Snohomish, WA

$1,000,000

Advertisement for Bids
Plans
Specs

Register on this project.

View self registered Bidders List

Builders Exchange of Washington, Inc. Subs and Suppliers

Owner:
Cross Valley Water District
8802 180th Street SE
Snohomish, WA 98296

Issued by:
www.bxwa.com

Engineer:
BHC Consultants, LLC
1601 5th Avenue, Suite 500
Seattle, WA 98101
206-505-3400
Fax: 206-505-3406

Contact:
Cameron Ochiltree, PE, Project Manager
cameron.ochiltree@bhcconsultants.com

Prebid: 12/8 @ 10:00 am, tour will depart from the District office, 8802 180th Street SE, Snohomish, WA 98296

Description:
The Lift Station 1 (LS-1) Improvements Project consists of upgrades and rehabilitation work at the existing wastewater lift station located at 21931 Bostian Road, Woodinville, Washington. The Work generally includes, but is not limited to, the following:

Electrical Improvements
• Replacement of the existing diesel generator with a new generator sized for extended continuous operation.
• Replacement of the Automatic Transfer Switch (ATS) with an owner-furnished ATS.
• Replacement of the existing bubbler system for measuring wet well level with a new submersible level transducer. Replacement of the existing wet well float switches with new.
• Replacement of the main circuit breaker and generator disconnect switch.
• Replacement of all interior and exterior lighting with LED fixtures.
• Replacement of the mini power center.
• Replacement of the power meter and service disconnect.

Structural Improvements
• Removal and replacement of deteriorated interior coatings in the dry well.
• Repair of structural deficiencies and resealing of dry well concrete ring joints.
• Installation of new handrails and stair or ladder access.
• Construction of a new concrete slab and canopy structure for the standby generator.

Mechanical Improvements
• Preparation and recoating of exterior surfaces of metallic piping (greater than or equal to 1-inch diameter) within the dry well.
• Replacement of existing pumps.
• Replacement of existing gate valves and check valves on pump discharge piping.
• Temporary bypass of sanitary sewage flows.

The Contractor shall furnish all labor, materials, equipment, tools, transportation, and incidentals necessary to provide a complete and operable installation in accordance with the Contract Documents